Objective. Students will navigate a computerized maintenance management system to enter condition-monitoring readings, generate corrective work orders from flagged findings, and produce an asset trend report that can be presented to a maintenance supervisor.
This lesson, its worked examples and its practice questions has not yet been verified by a licensed engineer or certified journey-level tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
A Computerized Maintenance Management System (CMMS) is the central nervous system of a modern maintenance department. In predictive maintenance (PdM), instruments such as vibration analyzers, ultrasound detectors, and infrared cameras collect data in the field. That data has no lasting value unless it is recorded, trended, and acted on. The CMMS is where raw readings become organized asset history, flagged alarms become corrective work orders, and months of measurements become trend reports that justify repair decisions to supervisors and plant management.
For industrial and marine facilities, a well-maintained CMMS database also supports regulatory compliance, insurance audits, and warranty tracking. Every entry you make is a legal and operational record — accuracy is not optional.
A vibration route is a defined list of measurement points on specific assets, collected in a set sequence. When you return from the field, your first task is to upload or manually enter the route results into the CMMS asset history.
Step-by-step entry process:
1. Log in and locate the asset. Use the asset ID or equipment tag number — never search by description alone, because similar names can create confusion between assets.
2. Open the condition-monitoring module. Most systems have a separate screen or tab for route-based readings, distinct from work orders.
3. Select the correct measurement point. Each asset typically has multiple points (drive end bearing, non-drive end bearing, motor housing, etc.). Entering a reading on the wrong point corrupts the trend.
4. Enter the value, units, and date/time. Common vibration units are in/s (inches per second, peak) or mm/s (RMS). Always match the units your analyzer was set to record.
5. Save and verify. After saving, review the entry on screen. A typo that changes 0.28 in/s to 2.8 in/s will trigger false alarms and waste resources.
If your facility uses a data collector that transfers readings electronically, confirm the upload completed and spot-check at least two points manually before closing the route.
When a measurement exceeds the alert or alarm threshold set in the CMMS, the system may flag it automatically, or you may flag it manually. Either way, a corrective work order (WO) must be created before any repair can be planned, parts can be ordered, or labor can be charged.
Key fields on a corrective work order:
Safety note: Before any bearing replacement work begins, a written lockout/tagout (LOTO) procedure for that asset must be referenced or attached to the work order. The CMMS is the correct place to link the LOTO procedure document. Never initiate a work order for rotating equipment without confirming a LOTO procedure exists.
A trend report plots asset readings over time, usually showing measurement value on the vertical axis and date on the horizontal axis, with alert and alarm limit lines overlaid. Generating this report in the CMMS typically involves:
1. Selecting the assets and measurement points to include.
2. Setting the date range (commonly 6–12 months for meaningful trending).
3. Choosing the report format and exporting as PDF for distribution.
Reading the trend is as important as generating it. A gradual upward slope over several months suggests progressive wear — you have time to plan a scheduled repair. A sudden step-change in one reading period suggests an acute event such as a lubrication failure or installation error — action is more urgent.
Writing an executive summary: A one-paragraph summary for a maintenance meeting should answer four questions: What asset? What is the trend showing? What is the likely cause or risk? What action is planned and when? Keep it factual and avoid speculation beyond what the data supports.
CMMS records are only as reliable as the people entering data. Follow these practices:
In marine environments, CMMS records may be reviewed by classification societies or port state control inspectors. Inaccurate or missing entries can result in operational findings against the vessel.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.
Does the school offer financial aid?
No. We don’t offer financial aid because we’re free. No, really: completely free.
Do you offer industry certification?
No. We are not certified yet, so we can’t offer that to students. What we do offer is knowledge and understanding of a trade.
Enroll first in the trade you’re interested in. You get your key, your program opens, and you begin studying.
Enroll free →