Objective. Students demonstrate integrated competency across a complete simulated operating shift that includes a normal power maneuver, one AOP activation, and one EOP entry, completing all associated documentation to shift-turnover standard.
This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
This is the capstone lab for the simulator training course. You will work as a full crew through a condensed, three-hour exercise that covers the same ground a real eight-hour operating shift must cover: a planned power maneuver, entry into an Abnormal Operating Procedure (AOP), and initiation of an Emergency Operating Procedure (EOP). Nothing about the timing of injected events is told to you in advance. When the shift is over, you write a complete shift log and then defend every significant decision in a structured post-shift critique. That sequence—act, document, explain—mirrors what is expected of every qualified operator on a licensed nuclear plant.
A licensed nuclear plant shift is built around clearly defined roles. For this exercise you rotate through three:
Each role carries distinct responsibilities. The SS does not reach across to manipulate controls; the RO does not abandon the board to perform field tasks. Maintaining role discipline during the simulator exercise is not a formality—it trains the communication and authority gradient that prevents errors on an operating unit.
Phase 1 – Normal Power Maneuver. The instructor will direct a power reduction using the plant's Normal Operating Procedure (NOP). The RO monitors axial flux distribution, control rod position limits, and reactor coolant system (RCS) temperature as power is changed. The NLO verifies supporting equipment status in the field. The SS approves each step. All parameter readings and times are logged continuously.
Phase 2 – AOP Activation. At an unannounced point, the instructor injects a plant abnormality—for example, a loss of a feedwater pump, a steam generator tube leak indicator, or a dropped control rod signal. The crew must recognize the entry condition for the applicable AOP, enter it promptly, and execute steps in sequence without skipping. Proper AOP use means: verify entry conditions are met before entry, execute each action step exactly as written, and do not take action outside the procedure without SS authorization. If a step cannot be performed as written, the SS uses the plant's procedure deviation process.
Phase 3 – EOP Initiation. A second, more serious injection causes an EOP entry—for example, indication of inadequate core cooling or a safety injection actuation. EOPs are symptom-based rather than event-based on most US plants: you enter based on what you observe (high containment pressure, low RCS pressure, loss of subcooling margin), not on what you think happened. The critical safety functions your EOP is designed to protect include reactivity control, RCS inventory and pressure, core heat removal, containment integrity, and electrical power availability. During EOP execution, the SS maintains situational awareness, the RO executes procedure steps, and the NLO performs field verifications and local operations. Every action and parameter reading must be logged in real time.
The shift log is a legal plant record. For this exercise it must contain:
Write the log as events happen. Reconstructing a log from memory after the exercise produces inaccurate times and missed entries.
The critique is an industry-standard learning tool. The instructor plays back the simulator recording and pauses at each decision point. You must answer three questions for every challenged action:
1. Which procedure step authorized or required this action?
2. Which parameter were you monitoring, and what was its value?
3. Which safety function were you protecting?
If you cannot answer all three, the action is marked unsatisfactory regardless of whether the plant remained safe. This is not a trick—it enforces the discipline that licensed operators must demonstrate on every NRC-observed evaluation.
The simulator is not a real plant, but the habits you form here transfer directly. Maintain the following practices:
You pass this lesson when your shift log meets 80% of the completeness rubric criteria with accurate times and factually consistent narratives, your crew evaluation checklist shows no missed critical tasks in the AOP or EOP phases, and your verbal defense in the critique correctly cites procedure basis for every challenged decision.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.
Does the school offer financial aid?
No. We don’t offer financial aid because we’re free. No, really: completely free.
Do you offer industry certification?
No. We are not certified yet, so we can’t offer that to students. What we do offer is knowledge and understanding of a trade.
Enroll first in the trade you’re interested in. You get your key, your program opens, and you begin studying.
Enroll free →